<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Mountain View Lot 12]]></title><description><![CDATA[Mountain View Lot 12]]></description><link>https://www.mountainviewlot12.org/blog</link><generator>RSS for Node</generator><lastBuildDate>Fri, 01 May 2026 22:09:28 GMT</lastBuildDate><atom:link href="https://www.mountainviewlot12.org/zh/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[Construction Update: Week of 04/20/26]]></title><description><![CDATA[Friday, April 24, 2026 Dear Neighbors, Welcome back to another update on the Mountain View Lot 12 project. This week, we started delivering and installing rebar for our first mat foundation placement. The 1st mat foundation placement date is scheduled for May 5th and will begin at 12am consisting of approximately 2,000 cubic yards of concrete with finishing crews working into the late-afternoon as the concrete sets. Starting the placement early at 12am is typical for placements of this size...]]></description><link>https://www.mountainviewlot12.org/post/construction-update-week-of-04-20-26</link><guid isPermaLink="false">69ebe77204fc81dfe25a130e</guid><pubDate>Fri, 24 Apr 2026 22:03:46 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_a1cb098eb4ef4d9c831ab4b05d074df9~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Construction Update: Week of 04/13/26]]></title><description><![CDATA[Friday, April 17, 2026 Dear Neighbors, This week, we continued to layout and install underground plumbing and electrical pipes on the south side of the project, working towards the middle of the site. Carpenters started assembling formwork for the mat slab and installing vapor barrier. Both activities will continue into next week as part of the mat foundation. In addition, we started offsite storm drain and water utility work on California Street which will continue throughout the month of...]]></description><link>https://www.mountainviewlot12.org/post/construction-update-week-of-04-13-26</link><guid isPermaLink="false">69e2b92d0c8d230c9e8e04c9</guid><pubDate>Fri, 17 Apr 2026 22:59:19 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_5edf20492a55428499c347fbae21a5dc~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Construction Update: Week of 04/06/26]]></title><description><![CDATA[Friday, April 10, 2026 Dear Neighbors, Welcome back to another update on the Mountain View Lot 12 project. This week, we started to layout and install underground plumbing and electrical pipes on the south side of the project. Carpenters also started to deliver material and began assembling formwork for the mat slab. Both activities, including formwork installation, will continue into next week as part of the mat foundation. In the meantime, we are expecting to wrap up onsite storm drain work...]]></description><link>https://www.mountainviewlot12.org/post/construction-update-week-of-04-06-26</link><guid isPermaLink="false">69d948ef75afb0779a6fb08f</guid><pubDate>Fri, 10 Apr 2026 19:02:07 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_ebfb179ae109458ba16c210e5bad37a0~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[施工进展更新：04/03/26 当周]]></title><description><![CDATA[2026年4月3日，星期五 亲爱的邻居们， 欢迎回来，以下是 Mountain View Lot 12 项目的最新进展。现场施工持续稳步推进。 本周，我们一直在对筏形基础和电梯井的最终底基层进行挖掘。预计本周将完成大部分土方外运工作。我们还启动了对底基层土壤的石灰处理，这有助于在开始筏形板钢筋作业前稳定和加固土壤。 下周，我们将开始安装地下管道和电气管线，并继续推进现场雨水排水管的安装。此外，您可能会注意到钢筋的到场交付以及筏形板模板工程的启动。 希望这些更新能帮助大家及时了解现场动态。如需最新进展，请访问项目网站： www.mountainviewlot12.org。 感谢您在施工期间的耐心与理解。如对当前施工作业有任何疑问，欢迎随时与我联系。 联系方式： 姓名：Christian Blevins 电话：408-462-2407 电子邮件： MVLot12Construction@related.com 此致， Christian Blevins 助理项目经理 Related California Construction 附言：如果您通过 Wix...]]></description><link>https://www.mountainviewlot12.org/zh/post/%E6%96%BD%E5%B7%A5%E8%BF%9B%E5%B1%95%E6%9B%B4%E6%96%B0%EF%BC%9A04-03-26-%E5%BD%93%E5%91%A8</link><guid isPermaLink="false">69d43c37da927501ed208f74</guid><pubDate>Mon, 06 Apr 2026 23:06:16 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_7b0716063c2d4152bf4be1de0e23cad0~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Actualización de Construcción: Semana del 04/03/26]]></title><description><![CDATA[Viernes, 3 de abril de 2026 Estimados Vecinos, Bienvenidos a otra actualización sobre el proyecto Mountain View Lot 12. Continuamos avanzando de manera constante en el sitio. Durante la semana, hemos estado excavando el subsuelo final de la cimentación tipo losa y los fosos del elevador. Esperamos concluir la mayor parte del retiro de tierra esta semana. También iniciamos el tratamiento con cal del suelo del subsuelo, lo cual ayuda a estabilizar y fortalecer la tierra antes de comenzar las...]]></description><link>https://www.mountainviewlot12.org/es/post/actualizaci%C3%B3n-de-construcci%C3%B3n-semana-del-04-03-26</link><guid isPermaLink="false">69d43bd2bf211ef4bcd38f86</guid><pubDate>Mon, 06 Apr 2026 23:05:18 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_7b0716063c2d4152bf4be1de0e23cad0~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[施工进展更新：03/27/26 当周]]></title><description><![CDATA[2026年3月27日，星期五 亲爱的邻居们， 欢迎回来，以下是 Mountain View Lot 12 项目的最新进展。 过去两周，我们一直在对场地进行挖掘并运走土方，为筏形基础的底基层做准备。挖掘和土方外运工作将持续至下周初。我们还在 Mercy Street 和 Bryant Street 交角处进行了挖掘，以安装项目的临时供电基础设施。 下周，我们将完成并验收底基层土垫层，这将使我们能够开始地下管道和电气施工、筏形基础模板安装以及电梯井挖掘工作。 希望这些更新能帮助大家及时了解现场动态。如需最新进展，请访问项目网站： www.mountainviewlot12.org。 感谢您在施工期间的耐心与理解。如对当前施工作业有任何疑问，欢迎随时与我联系。 联系方式： 姓名：Christian Blevins 电话：408-462-2407 电子邮件： MVLot12Construction@related.com 此致， Christian Blevins 助理项目经理 Related California Construction 附言：如果您通过 Wix...]]></description><link>https://www.mountainviewlot12.org/zh/post/%E6%96%BD%E5%B7%A5%E8%BF%9B%E5%B1%95%E6%9B%B4%E6%96%B0%EF%BC%9A03-27-26-%E5%BD%93%E5%91%A8</link><guid isPermaLink="false">69d43b822d26c74b480df896</guid><pubDate>Mon, 06 Apr 2026 23:03:29 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_04513acb06394d99a48fe091c24a89d1~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Actualización de Construcción: Semana del 03/27/26]]></title><description><![CDATA[Viernes, 27 de marzo de 2026 Estimados Vecinos, Bienvenidos a otra actualización sobre el proyecto Mountain View Lot 12. Durante las últimas dos semanas, hemos estado excavando y retirando tierra del sitio mientras preparamos el subsuelo para nuestra cimentación tipo losa. La excavación y el retiro de tierra continuarán hasta principios de la próxima semana. También hemos excavado en la esquina de Mercy Street y Bryant Street para instalar la infraestructura de energía temporal para el...]]></description><link>https://www.mountainviewlot12.org/es/post/actualizaci%C3%B3n-de-construcci%C3%B3n-semana-del-03-27-26</link><guid isPermaLink="false">69d43b452d26c74b480df872</guid><pubDate>Mon, 06 Apr 2026 23:02:18 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_04513acb06394d99a48fe091c24a89d1~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Actualización de Construcción: Semana del 3/9/26]]></title><description><![CDATA[Estimados Vecinos, En primer lugar, muchas gracias por la respuesta positiva a nuestra primera actualización de construcción el viernes pasado. Agradecemos la cálida recepción y esperamos compartir actualizaciones regulares sobre el proyecto de 424 Bryant durante toda la duración de la construcción. Hoy marca el final de la segunda semana de construcción. Durante la semana pasada, el equipo retiró y recicló los postes de luz y el asfalto del estacionamiento. Las actividades de esta semana...]]></description><link>https://www.mountainviewlot12.org/es/post/actualizaci%C3%B3n-de-construcci%C3%B3n-semana-del-3-9-26</link><guid isPermaLink="false">69d43a1484f06407d56ab0a5</guid><pubDate>Mon, 06 Apr 2026 23:00:22 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/cd77a7_918e1ec03067456c8c91dfceaf3d8280~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[施工进展更新：3/9/26 当周]]></title><description><![CDATA[亲爱的邻居们， 首先，非常感谢大家对上周五第一期施工更新的积极回应。我们非常感激大家的热情接待，并期待在整个施工期间定期分享 424 Bryant 项目的最新动态。 今天标志着施工第二周的结束。上周，团队拆除并回收了停车场的灯柱和沥青。本周的工作包括：为施工期间保留的所有树木安装保护装置；清除现有树桩周围的灌木和植被（此过程称为"清场和整地"）；以及为施工车辆建立主要工地入口，为下周关闭 Bryant Street 南行车道做准备。如果您前往现场，可以看到周边街道设置了围栏和交通管制标志。 下周，我们预计将清除场外树木，并开始进行钻探作业，为街道公用设施施工做准备。团队还将开始挖掘并运走场地内的泥土，为筏形基础工程腾出空间。 我们已租用 California 和 Bryant 西北角的空地，供施工人员停放车辆。施工人员不应占用街道停车位。如果您发现施工人员在社区街道停车，欢迎提供车辆描述和车牌号，以便我们直接跟进相关工人及其所在公司。 我们也希望大家能热情欢迎未来两年中在这个社区工作的建筑工人。他们中的许多人会在附近用餐和喝咖啡，他们的存在有助于在工作日支持当地市中心的餐厅和小型...]]></description><link>https://www.mountainviewlot12.org/zh/post/%E6%96%BD%E5%B7%A5%E8%BF%9B%E5%B1%95%E6%9B%B4%E6%96%B0%EF%BC%9A3-9-26-%E5%BD%93%E5%91%A8</link><guid isPermaLink="false">69d43a9f70b73fd8fdbe7692</guid><pubDate>Mon, 06 Apr 2026 22:59:57 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/cd77a7_918e1ec03067456c8c91dfceaf3d8280~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Construction Update: Week of 04/03/26]]></title><description><![CDATA[Friday, April 3, 2026 Dear Neighbors, Welcome back to another update on the Mountain View Lot 12 project. We continue to make steady progress on site. Throughout the week, we have been excavating the final subgrade of the mat foundation and elevator pits. We are expecting to wrap the bulk of the offhauling this week. We also started lime treatment of the subgrade dirt, which helps stabilize and strengthen the dirt prior to starting mat slab rebar activities. Next week, we will start...]]></description><link>https://www.mountainviewlot12.org/post/construction-update-week-of-04-03-26</link><guid isPermaLink="false">69d02a812a4608ae00201d37</guid><pubDate>Fri, 03 Apr 2026 21:09:11 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_7b0716063c2d4152bf4be1de0e23cad0~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Construction Update: Week of 03/27/26]]></title><description><![CDATA[Friday, March 27, 2026 Dear Neighbors, Welcome back to another update on the Mountain View Lot 12 project. Over the past two weeks, we have been excavating and off hauling dirt from the site as we prepare the sub grade for our mat foundation. Excavation and off haul will continue into early next week. We’ve also excavated at the corner of Mercy Street &#38; Bryant Street to install temporary power infrastructure for the project.  Next week, we will be finishing and certifying our subgrade dirt...]]></description><link>https://www.mountainviewlot12.org/post/construction-update-week-of-03-16-26-1</link><guid isPermaLink="false">69c72f6c5ed83abd8bc00342</guid><pubDate>Sat, 28 Mar 2026 01:36:34 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_04513acb06394d99a48fe091c24a89d1~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Actualización de Construcción: Semana del 16/03/26]]></title><description><![CDATA[Estimados vecinos, Bienvenidos nuevamente a otra actualización sobre el proyecto Mountain View Lot 12 . Durante la semana pasada, instalamos una entrada principal al sitio para vehículos de construcción, colocamos protección para todos los árboles que permanecerán durante la duración de la obra, y completamos la eliminación de toda la vegetación superficial, plantas y otros desechos del sitio. Esta semana, el carril en dirección sur de Bryant Street fue cerrado. Este cierre mantiene seguros a...]]></description><link>https://www.mountainviewlot12.org/es/post/actualizaci%C3%B3n-de-construcci%C3%B3n-semana-del-16-03-26</link><guid isPermaLink="false">69bdbb74effbaff15d3538bb</guid><pubDate>Fri, 20 Mar 2026 21:32:11 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_5d7a5429852642e98e739ccdbc0c3d86~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[施工更新：2026年03月16日当]]></title><description><![CDATA[周亲爱的邻居们， 欢迎查看关于 Mountain View Lot 12  项目的最新进展。 在过去的一周里，我们已为施工车辆设置了主要工地入口，为施工期间保留的所有树木安装了保护措施，并完成了场地内所有地表灌木、植物及其他杂物的清理工作。 本周，Bryant Street 南向车道已关闭。此举旨在保障施工人员和公众的安全，为重型设备提供作业空间，并提高施工效率。该车道将在整个施工期间保持关闭。我们还移除了场地内指定的树木，并开始运送重型设备。为准备基础垫层施工，我们已开始进行初步整地、开挖以及土方外运工作，并将持续至下周。 下周，我们将在 Mercy Street 与 Bryant Street 交叉口开始临时供电设施的开挖工作。团队还计划启动现场雨水排水管道的施工。 希望这些更新能帮助您了解现场的最新动态。如需获取最新信息，请访问项目网站： www.mountainviewlot12.org 感谢您在施工期间的耐心。如您对当前施工有任何疑问，请随时与我联系。 联系信息： 姓名：Christian Blevins 电话：408-462-2407...]]></description><link>https://www.mountainviewlot12.org/zh/post/%E6%96%BD%E5%B7%A5%E6%9B%B4%E6%96%B0%EF%BC%9A2026%E5%B9%B403%E6%9C%8816%E6%97%A5%E5%BD%93</link><guid isPermaLink="false">69bdb8d0da3dad8a9990321e</guid><pubDate>Fri, 20 Mar 2026 21:22:51 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_5d7a5429852642e98e739ccdbc0c3d86~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Construction Update: Week of 03/16/26]]></title><description><![CDATA[Dear Neighbors, Welcome back to another update on the Mountain View Lot 12 project. Over the past week, we assembled a primary jobsite entrance for construction vehicles, installed tree protection for all trees remaining in place for the duration of construction, and completed the removal of all surface brush, plants and other debris from the site. This week, the south-bound lane on Bryant Street closed. This closure keeps workers and the public safe, creates space for heavy equipment, and...]]></description><link>https://www.mountainviewlot12.org/post/construction-update-week-of-03-16-26</link><guid isPermaLink="false">69bda4069b4f1678f081c5d1</guid><pubDate>Fri, 20 Mar 2026 20:01:51 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_5d7a5429852642e98e739ccdbc0c3d86~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Construction Update: Week of 3/9/26]]></title><description><![CDATA[Dear Neighbors, First, thank you so much for the positive response to our first construction update last Friday. We appreciate the warm reception and look forward to sharing regular updates on the 424 Bryant project throughout the duration of construction. Today marks the end of the second week of construction. This past week, the team removed and recycled the parking lot light poles and asphalt. Activities for this week included setting up tree protection for all trees remaining in place...]]></description><link>https://www.mountainviewlot12.org/post/construction-update-week-of-3-9-26</link><guid isPermaLink="false">69b46ccdd1b1d9cdf213cb6d</guid><pubDate>Fri, 13 Mar 2026 21:17:28 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/cd77a7_918e1ec03067456c8c91dfceaf3d8280~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Mountain View Lot 12 项目于 2026 年 3 月 2 日正式开工]]></title><description><![CDATA[亲爱的邻居们：  我叫 Christian，是 Related California Construction 的总承包商，负责监督位于 424 Bryant 的施工项目（即 Mountain View Lot 12）。我们已于 3 月 2 日星期一正式开始建设这个 100% 经济适用房项目。目前围栏已经安装完毕，我们很快将开始拆除现有的沥青地面停车场。 随着工程的展开，我想向大家做个自我介绍，并提供一个直接联系方式，以便各位在施工期间有任何问题或疑虑时与我联系。我们的团队致力于尊重社区环境，并尽一切可能减少对大家生活的干扰。 根据当地法规，通常的工作时间为周一至周五，大约上午 7:00 到下午 6:00。在此期间，该地区偶尔可能会出现施工噪音、物资运送或承包商停车的情况。我们将尽最大努力保持施工现场及周边街道的整洁、安全与有序。 我还计划在大多数周五提供简短的施工进度更新，以便邻居们了解接下来的工程安排。如果您有任何想要讨论的事宜，请随时直接与我联系。我很乐意帮助您及时解决顾虑。 联系信息： 姓名：Christian Blevins 电话：408-462-2407...]]></description><link>https://www.mountainviewlot12.org/zh/post/mountain-view-lot-12-%E9%A1%B9%E7%9B%AE%E4%BA%8E-2026-%E5%B9%B4-3-%E6%9C%88-2-%E6%97%A5%E6%AD%A3%E5%BC%8F%E5%BC%80%E5%B7%A5</link><guid isPermaLink="false">69b45ef19e67732541ea76b0</guid><pubDate>Fri, 13 Mar 2026 19:04:07 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_e86e1869fbfd4cd5b5e46361dc1bcb32~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[La construcción de Mountain View Lot 12 comenzó el 02/03/26]]></title><description><![CDATA[Estimados vecinos:   Mi nombre es Christian y soy el contratista general de Related California Construction que supervisa el proyecto de construcción en 424 Bryant, conocido como Mountain View Lot 12. Comenzamos la construcción de este desarrollo de viviendas 100% asequibles el lunes 2 de marzo. Ya se ha instalado el cercado perimetral y pronto comenzaremos con la demolición del actual estacionamiento de superficie de asfalto. A medida que avanzan los trabajos, quería presentarme y ofrecer un...]]></description><link>https://www.mountainviewlot12.org/es/post/la-construcci%C3%B3n-de-mountain-view-lot-12-comenz%C3%B3-el-02-03-26</link><guid isPermaLink="false">69b45dbbacb000bd1481b573</guid><pubDate>Fri, 13 Mar 2026 18:59:48 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_e86e1869fbfd4cd5b5e46361dc1bcb32~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item><item><title><![CDATA[Mountain View Lot 12 Began Construction on 03/02/26]]></title><description><![CDATA[Dear Neighbors,   My name is Christian, and I’m the General Contractor with Related California Construction overseeing the construction project at 424 Bryant, known as Mountain View Lot 12. We began construction on this 100% affordable housing development on Monday, March 2. The perimeter fencing has now been installed, and we will soon begin demolition of the existing asphalt surface parking lot.   As work gets underway, I wanted to introduce myself and provide a direct point of contact...]]></description><link>https://www.mountainviewlot12.org/post/mountain-view-lot-12-began-construction-on-03-02-26</link><guid isPermaLink="false">69ab245bbcc8e6b4393ab504</guid><pubDate>Fri, 06 Mar 2026 21:55:17 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/5cf584_e86e1869fbfd4cd5b5e46361dc1bcb32~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>MVLot12</dc:creator></item></channel></rss>